Home
Forums
New posts
Search forums
What's new
New posts
Latest activity
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Home
Forums
Brown Cafe UPS Forum
UPS Discussions
Ask a Feeder Driver, Feeder Driver FAQ
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Message
<blockquote data-quote="104Feeder" data-source="post: 1299533" data-attributes="member: 42554"><p>Here, we have had a grievance settlement for over a decade where loaded trailers without paperwork will be treated as rehandles at the discretion of the Driver. They tried subverting that when the new electronic hazmat recording came out, but a few examples of physical hazmats being present without showing up on the electronic record put a stop to that. </p><p></p><p>I read earlier where the DOT was going to accept electonic records, with just a phone number to call to access the hazmats. That seems disingenuous on the part of the DOT as it adds an unnecessary and potentially fatal delay to what should be a simple process. Perhaps the lack of a significant tradgedy as caused them to relax. It will be interesting to see if this new process subverts our previous grievance settlement. </p><p></p><p></p><p>Oh and the guy with the 12'6" bridge? How do you not notice a low bridge like that? I had one bridge I had to go under regularly that was posted at 13'9" but you could see where they had paved a few times under it and the heat had caused the asphalt to pool up directly underneath so I never trusted that sign and went under very slowly while visually checking clearance.</p></blockquote><p></p>
[QUOTE="104Feeder, post: 1299533, member: 42554"] Here, we have had a grievance settlement for over a decade where loaded trailers without paperwork will be treated as rehandles at the discretion of the Driver. They tried subverting that when the new electronic hazmat recording came out, but a few examples of physical hazmats being present without showing up on the electronic record put a stop to that. I read earlier where the DOT was going to accept electonic records, with just a phone number to call to access the hazmats. That seems disingenuous on the part of the DOT as it adds an unnecessary and potentially fatal delay to what should be a simple process. Perhaps the lack of a significant tradgedy as caused them to relax. It will be interesting to see if this new process subverts our previous grievance settlement. Oh and the guy with the 12'6" bridge? How do you not notice a low bridge like that? I had one bridge I had to go under regularly that was posted at 13'9" but you could see where they had paved a few times under it and the heat had caused the asphalt to pool up directly underneath so I never trusted that sign and went under very slowly while visually checking clearance. [/QUOTE]
Insert quotes…
Verification
Post reply
Home
Forums
Brown Cafe UPS Forum
UPS Discussions
Ask a Feeder Driver, Feeder Driver FAQ
Top