Home
Forums
New posts
Search forums
What's new
New posts
Latest activity
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Home
Forums
Brown Cafe UPS Forum
UPS Discussions
Ask a Feeder Driver, Feeder Driver FAQ
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Message
<blockquote data-quote="Cowboy Mac" data-source="post: 5584541" data-attributes="member: 59074"><p>Yeah good luck with that. </p><p></p><p>Here I was told in training that to pre trip a tractor should take 7 minutes. Okay. Sometimes I can do that and be thorough, sometimes it takes me 10-15 if I can’t find the tractor or if it is an older one with no light test button, or takes a long time to build air. </p><p></p><p>They told me that to pre trip a single should take about 15 minutes and to build a set should take 32 minutes. The single is no problem, but the set usually takes me about 45 minutes to an hour depending on many factors. </p><p></p><p>DOT says the driver shall satisfy himself with the condition of the equipment. </p><p></p><p>It is a violation of the STAA for a company to discipline or threaten to discipline a driver for taking “too long” on a pre-trip inspection. </p><p></p><p>[URL unfurl="true"]https://www.ecfr.gov/current/title-49/subtitle-B/chapter-III/subchapter-B/part-392/subpart-A/section-392.7[/URL]</p></blockquote><p></p>
[QUOTE="Cowboy Mac, post: 5584541, member: 59074"] Yeah good luck with that. Here I was told in training that to pre trip a tractor should take 7 minutes. Okay. Sometimes I can do that and be thorough, sometimes it takes me 10-15 if I can’t find the tractor or if it is an older one with no light test button, or takes a long time to build air. They told me that to pre trip a single should take about 15 minutes and to build a set should take 32 minutes. The single is no problem, but the set usually takes me about 45 minutes to an hour depending on many factors. DOT says the driver shall satisfy himself with the condition of the equipment. It is a violation of the STAA for a company to discipline or threaten to discipline a driver for taking “too long” on a pre-trip inspection. [URL unfurl="true"]https://www.ecfr.gov/current/title-49/subtitle-B/chapter-III/subchapter-B/part-392/subpart-A/section-392.7[/URL] [/QUOTE]
Insert quotes…
Verification
Post reply
Home
Forums
Brown Cafe UPS Forum
UPS Discussions
Ask a Feeder Driver, Feeder Driver FAQ
Top