I imagine these are the trucks that most stations are getting?
The Chanje chargers at the stations around here have all had that name taken off and been rebuilt to higher standards to be able to charge multiple trucks now at the same time. One of the stations around here took out all the chargers that had installed because it turn out the city would not let them hook up to the electric on the street. You think you would have asked that first before spending over $1m for the install only having to rip it all out.
The trucks have actually been pretty darn reliable for over the past 6 months. The bumpers are not real bumpers so the drivers have to keep that in mind when backing into loading docks. The won't take as much punishment like the old Grummans.