Lol we saw our "plan" today. They are double parking trucks in the aisle sideways blocking all the trucks in then putting metal rollers between trucks. Existing preloaders now in addition to the huge surge in their own volume, have to pull other cages and push them along the metal rollers then a loader loads 1 truck in the aisle constantly having to step up in and out from ground level. Neatest part about this plan? Now every truck leaves late because of the unwrapped trucks in the aisle blocking everyone in. Got an extra 20 minutes free pay after my truck was wrapped to stand there laughing.
We Are READY! (to fail again)