I’ve only ever seen PE welding something on a Push put bay. I’ve never seen them really weld anything. The only time I ever call PE. Is for fod on auto rollers on the secondary, when a vertical belt craps out on the sorter belt, or when a diverter won’t come out of VFD. Never seen many actually fix anything